Recently Completed: Hanover - Beaver Dam Road (Route 715) Bridge Replacement over Newfound River
Cost and schedule ►
Traffic alerts ►
Public outreach ►
The purpose of the project was to replace the bridge over Newfound River. The previous structure was constructed in 1959.

Benefits
The project provides drivers in the area with a newly constructed bridge to replace the former, structurally deficient bridge.
Resources
              
                    Marcos Kocolis
                    804-585-3583
                    
Phase: Complete
UPC: 109988
State ID: 0715-042-825,B645, M501, P101, R201
                Lat/Long: 37.847806, -77.690346
                
              
              
                
                
                Locality:
                
                Hanover
                
                
                
                
            



 
            
						
