Studies: Timberlake Road Corridor Improvement Study
Cost and schedule ►
 
  
  
      
 
    
    
   
    This study evaluated the existing and projected future conditions on Timberlake Road between Waterlick Road and Leesville Road; identified deficiencies in the road network; forumlated alternatives and corrective measures; computer planning level cost estimates; and prioritized recommended improvements along Timberlake Road.
Benefits
Identify the extent of the operational and safety challenges on the corridor. Develop potential transportation solutions.
Resources
              
                    Rick Youngblood
                    434-856-8331
                    
Other relevant links:
Phase: Study
                Lat/Long: 37.347859, -79.232638
                
              
              
                
                
                Locality:
                
                Lynchburg
                
                
                
                
            