Recently Completed: Route 29, Main Street, Towns of Altavista and Hurt
Cost and schedule ►
Public outreach ►
This project replaced the bridge over the Staunton River and Norfolk Southern Railway.
Benefits
The structure was built in 1929 and is poor condition. It has a twelve-month inspection frequency. Considering the age, condition, geometrics and type of structure, the practical and cost-effective solution is total replacement.
The new structure is a two-lane bridge on approximately the same alignment as the current bridge.
Resources
              
                    Lindsey S. Hodges, P.E.
                    434-856-8143
                    
Major funding source: State of Good Repair, Federal Funds
UPC: 104944
Lat/Long: 37.091487, -79.332112
                
              
              
                
                
                Locality:
                
                Campbell
                
                
                
                
            